Integrated Cooperative Development Project: Impact and Sustainability

₹ 795.00

SKU: SP4 Categories: , , Tag: Product ID: 1267
K. Ravichandran
2015, 144pp
Hardbound, 9788193033333
Rs. 795

The Integrated Cooperative Development Project (ICDP) was introduced by National Cooperative Development Corporation (NCDC) during 1985-86. This project has been in operation in majority of the districts in India. However, very few attempts have been made to study the impact of this project. The present work analyzed the impact of ICDP and the sustainability of the outcome of the project in Theni district, Tamil Nadu.

The project was introduced in Theni district during the year 2005-06 with the total outlay of Rs 987.73 lakhs and the project was completed on 31 March 2011. This study found that ICDP’s monetary and non-monetary interventions have created both tangible and intangible impact on the business profile of cooperative societies in this district. As compare to pre-project period with post-project period, the latter witnessed many cooperatives in the district which have become viable entities and could retain their image among the members and other stakeholders through enhanced service, general facelift, and inclusive approach.

The books available at present in the field of Cooperation and Cooperatives have not detailed about this Pan India Project of National Cooperative Development Corporation, New Delhi. This book has been written keeping in mind the requirements of both the researchers and the officials with examples for office note/resolutions. This book will serve as a base for further research into the field of Cooperation, Rural Development, & Third Sector Enterprises at college/university/training institute level.

Dr K. Ravichandran is Associate Professor and Head, Department of Cooperation, Gandhigram Rural Institute, Gandhigram, Tamil Nadu.

1. Integrated Cooperative Development Project
• Introduction
• Integrated Cooperative Development Project
• Objectives of ICDP
• Pattern of Funding
• Preparation of DPR
• Sanction of the Project
• Project Monitoring Committees
• Annexure

2. Formation of Project Office
• Introduction
• Securing Necessary Infrastructure
• Procuring and Deployment of Staff
• DPR and Government Order to be Studied
• Sanction, Utilization, and Recovery of Loans
• Manpower Development and Training
• Completion of Project, Reporting, and Impact Study
• Annexure

3. ICDP in Theni District
• Introduction
• Cooperative Outreach in Theni District
• Overview of ICDP
• ICDP in Theni District

4. ICDP and Business Profile of Cooperative Societies
• Introduction
• PACS and ICDP
• PCARDB and ICDP
• MDCCB and ICDP
• PCMS and ICDP
• PCCS and ICDP
• ICDP and Other Cooperative Societies
• Annexure

5. Manpower Development, Member Education, and Training
• Manpower Development
• Member Education
• Training
• Performance Linked Incentives – Trends in Distribution
• Case Analysis

6. Findings and Conclusion
• Introduction
• Findings
• Conclusion

References